Software Testing Life Cycle (STLC)
Software testing
life cycle identifies what test activities to carry out and when (what is the
best time) to accomplish the test activities. Even though testing differs in
various organizations, there is a testing life cycle.
1.
Test Planning
2.
Test development
3.
Test execution
4.
Result Analysis
5.
Bug Tracking
6.
Reporting
Software testing has its
own life cycle that intersects with every stage of the SDLC. The basic
requirements in software testing life cycle is to control/deal with software
testing – Manual, Automated and Performance.
1. TEST PLANNING:
Test
plan is a systematic approach to testing a system
such as a machine or software. The plan typically contains a detailed
understanding of what the eventual workflow will be.
Test Plan Document generally includes the following:
Test Plan Document generally includes the following:
i. Introduction
-Objective:
Purpose of the document is specified over here.
-References Document:
-Objective:
Purpose of the document is specified over here.
-References Document:
The
list of all the documents that are .(SRS and Project Plan)
ii. Coverage of Testing
-inscope (Features to be tested):
The list of all the features that are to be tested based on the Implicit and explicit requirements from the customer will be mentioned here.- -outscope (Features not to be tested)
The list of all the features that can be skipped from testing phase are mentioned here, Generally Out of scope features such as incomplete modules are listed here. If severity is low and time constraints are high then all the low risk features such as GUI or database style sheets are skipped. Also the features that are to be incorporated in future are kept out of testing temporarily.
-inscope (Features to be tested):
The list of all the features that are to be tested based on the Implicit and explicit requirements from the customer will be mentioned here.- -outscope (Features not to be tested)
The list of all the features that can be skipped from testing phase are mentioned here, Generally Out of scope features such as incomplete modules are listed here. If severity is low and time constraints are high then all the low risk features such as GUI or database style sheets are skipped. Also the features that are to be incorporated in future are kept out of testing temporarily.
iii. Test Strategy
-Levels of testing: It’s a project level term which describes testing procedures in an organization. All the levels such as Unit, module, Integration, system and UAT (User Acceptance test) are mentioned here which is to be performed.
-Levels of testing: It’s a project level term which describes testing procedures in an organization. All the levels such as Unit, module, Integration, system and UAT (User Acceptance test) are mentioned here which is to be performed.
-Types
of testing:
All the various types of testing such as compatibility, regression and etc are
mentioned here with module divisions
-Test
design techniques:
The List of All the techniques that are followed and maintained in that company
will be listed out here in this section. Some of the most used techniques are
Boundary Value Analysis (BVA) and Equivalence Class Participation (ECP).
-Configuration
Management:
All the documents that are generated during the testing process needs
to be updated simultaneously to keep the testers and developers aware of
the proceedings. Also the naming conventions and declaring new version numbers
for the software builds based on the amount of change is done by the SCM
(Software Configuration Management team) and the details will be listed here.
-Test Metrics: The list of all
the tasks that need to be measured and maintained will be present here.
Different metrics for tracing back the exact requirement and test case depends
on the availability of metrics at the right time.
-Terminology:
Testing
specific jargons for the project that will be used internally in the company
will be mentioned here in this section.
-Automation Plan:
The list of all the features or modules that are planned for automation testing
will be mentioned here. The application only undergoes automation testing after
being declared STABLE by the manual testing team.
-List of Automated tools: The list of Automated
tools, like QTP, Load runner, Win runner; etc which will be used in this
project will be mentioned along with license details.
iv. Base Criteria:
-Acceptance
Criteria: The standards or metrics that need to be achieved by
the testing team before declaring the product fit will be listed here. So
before handing over to the customer, the time at which the testing needs
to be stopped is mentioned here in this section.
-Suspension Criteria: In high risk projects,
or huge projects that consists several modules, It is necessary to
minimize the repetitive process to be efficient. The situations when the
testing needs to be suspended or temporarily halted will be listed here in this
section
v.
Test deliverables:
The list of all the documents that are to be prepared during the testing
process will be mentioned here in this section. All the copies
of verification documents after each level are submitted to the customer
along with the user manual and product at the end of the project.
Documents include:
1. Test Plan
Document
2. Test Scenarios
Document
3. Test case
Document
4. RTM
5. Defect Reporting
Document
6. Final Summary
Report
vi.Test environment:
Environmental components and combinations that will be simulated for testing
the product will be made sure that it is very close to the actual environment
when the end user works on the product. All the details will be mentioned here
in this section that is to be used for testing the application.
vii.
Resource planning:
Roles to be performed or in other words who has to do what will be mentioned
clearly here.
viii.
Scheduling:
The starting dates and ending dates for each and every task and module will be
listed here in this section.
ix. Staffing and Training:
ix. Staffing and Training:
How much staff is to be recruited and what kind of training is to be provided
to accomplish this project successfully will be described here in a detailed
fashion.
x. Risks and Contingencies:
The list of all the potential
risks and the corresponding solution plans will be listed here
Risks: Example, Resources
may leave the organization, license and update deadlines, customer may change
the requirements in terms of testing or maintenance in middle of the project
etc
Contingencies: Maintaining bench strength, Rechecking initial stages
of the whole process, Importance and priority settings for features to be
tested and features to be skipped under time constraints to be listed and
shared clearly.
xi. Assumptions:
Some features or testing
methods have to be done mandatorily even though, the customer does not mention
it in his requirements document. These assumptions are listed out here in this
section.
xii. Approval Information
As this document is published and circulated, the relevant and required
authorities will approve the plan and will update this section with necessary
details like date and department etc.
2. TEST DESIGN STAGE:
This
is the most important stage of the testing life cycle, in this phase of the
testing; the testers will develop the test
scenarios and test cases based
against the requirements of the customer.
2.1. Test Scenario
A set of test cases
that ensure that the business process flows are tested from end to end. They
may be independent tests or a series of tests that follow each other, each
dependent on the output of the previous one.
The following is the
2.2. Test Case
Test Development simply involves writing Test cases from test scenarios.
Every Company follows a particular format for test cases called test case
template
Test cases are broadly divided into two types.
·
G.U.I Test Cases.
·
Functional test cases.
Functional test cases are further divided into two types.
·
Positive Test Cases.
·
Negative Test Cases.
Test
case template typically consists of
Test Case ID: Test Case number
Test
case created on: The
date test case created on
Category: category deals with type of the
testing done like functional, GUI,
negative testing etc
Test Scenario: A set of test cases that
ensure that the business process flows are tested from end to end. They may be
independent tests or a series of tests that follow each other, each dependent
on the output of the previous one.
Test Data: If you are writing test case
then you need input data for any kind of test. Tester may provide this input
data at the time of executing the test cases. The test data may be any kind of
input to application, it may be in any format like xml test data, system test
data, SQL test data or stress tested.
Generally testers call it as test bed. In test bed all software
and hardware requirements are set
using the predefined data values. If you don’t have the systematic approach for
building test data while writing and executing test cases then there are chances of missing some important test cases
Execution steps: The steps to be followed to execute the test case
Expected Result: When the test case is executed what has happened dictates the expected
result
Actual Result: What is actually expected when the test case is executed
Status: The pass or fail criteria
Comments: Any comments can be added.
2.3. Requirement Traceability Matrix
The Test cases ensure that all the
functionalities are being covered in testing but these should be mapped with
business requirements to ensure that all the requirements are met. For this we
need to prepare RTM, to verify 100% Coverage of Requirements.
Requirement Traceability matrix typically
consists of
Requirement ID:
Maps to the requirement document
Requirement Description: Brief Description of the requirement
Reference Document: The document from where the requirement
is fetched like BRD,SRS etc
Module
Name: The module in the project where the
requirement is under consideration
Test
Case ID: The Test case Id
from the test case template
Requirement
Changes: If
any changes are made in the requirements that has to be notified.
3. TEST EXECUTION PHASE:
In this phase test engineers will execute the test
cases and log the defects. During the test execution phase the test
engineer will do the following.
a) He
will perform the action that is described in the description column.
b) He
will observe the actual behavior of the application.
c) He
will document the observed value under the actual value column.
4. RESULT ANALYSIS:
After the successful execution of test cases, the
tester will compare the expected values with the actual values and declare the
result as pass or fail.
5. BUG TRACKING AND REPORTING:
It consists of entire list of defects you have come
across while testing your application. We have a defects meeting where QA,
Developers and PM attend and discuss the defects. If they think it’s a valid
defect then QA lead assigns it to development lead who in turn will assign it
to the developer to fix the defect.
5.1 Difference between Bug, Defect and Error
Error: Any mismatches while compiling
the code is called Error. A human action which produces an incorrect result. In
simple words error in programming or coding is an error
Defect: A flow in a component or system
that can cause the component or system to fail to perform its required
function. The gaps in functionality or any mismatches in functionality are
called a defect.
Bug: The defects accepted by developers are bugs.
Fault: Fault is similar to a defect.
Failure: Deviation of the component or system from its expected delivery,
service or result.
Issue: It’s same as defect.
Suggestion: The points not covered in BRD but which can improve quality can be
suggested by testers to the developers
5.2. Reporting Of bugs
a)
Classical Bug Reporting Process:
Drawbacks: 1.Time consuming
2. Redundancy.
3. No Security.
b) Common Repository Oriented Bug Reporting Process:
Drawbacks: 1.Time consuming.
2. Redundancy.
c) Bug Tracking Tool Oriented Bug Reporting Process:
Very Important stage to update the DPD (Defect profile document) and the let the developers know of the defects.
5.3. DPD (Defect Profile Document)
Defect ID: Serial no. of the defect
Defect Description: A brief description of the defect.
Status: Status of the defect
Status - New/Open/Assign/Deferred/Rejected/Re Opened/Closed.
a) New: When the bug is posted for the first time, it states will be new this means the bug is not yet approved.
b) Open: After a tester has posted a bug, the lead of the tester will approves the bug is genuine and he changes the state as “OPEN”.
c) Assign: Once the lead changes the state as “OPEN” he assigns the bug to the corresponding developer or developer team.
d) Deferred: The bug changed to deferred state means the bug is expected to fix in next release due to various factors.
e) Rejected: If the developer feels the bug is not genuine, he rejects the bug. The state of the bug changed to “REJECTED”.
f) Reopened: If the bug still exists even after the bug is fixed by the developer, the tester changes the statues to “RE-OPENED”.
g) Closed: Once the bug is fixed, it is tested by tester. If the tester feels that the bug no longer exists in the software, he changes the status of the bug to “CLOSED”.
Severity: Impact of Bug on the application. The different Severities are Show stopper, Critical, Major, Minor, Cosmetic. It will be decided by the tester.
a) Show stopper: Stops development and/or testing work.
b) Critical: Crashes, loss of data, severe memory leak.
c) Major: Major loss of function.
d) Minor: Minor loss of function, or other problem where easy work around is present.
e) Cosmetic: Cosmetic problem like misspelled words or misaligned text, Background color of the specific field.
Priority: Priority of the Bug as per the client's requirements.
The different priorities are High, Medium and Low.
a) High: Bug must be fixed immediately; the product cannot ship with this bug.
b) Medium: These are important problems that should be fixed as soon as possible. The problem should be fixed within the time available.
c) Low: It is not important that these bugs be addressed.
Fix these bugs after all other bugs have been fixed
Test case ID: Test case Number that is written in the test case Document.
Assigned To: Person (developer) to whom the bug is assigned to fix.
Assigned By: Testing personnel by whom the bug is found or the Testing person who assigns the bug to developer.
Date of testing: The date on which testing is done.
Remarks: Any remarks can be provided.
Once all the bugs are fixed and complete regression testing is done then the final summary report is made.
5.2. Final summary report
6. TEST CLOSURE:
It is the last phase of STLC process. All test cases execution should be completed and there should not be any high level severity and high level priority bugs. Once the UAT has done with successfully then final test summary report is generated and then sign off the project.
· Client Acceptance
· Replication of product delivery records submission client sign-off.